EN 15804+A1 2012
In 2019 the EN 15804+A1 2012 was updated to EN 15804+A2 Sustainability of construction works - Environmental product declarations - Core rules for the product category of construction products. The application of the previous standard expired in October 2022, so all EPD's created according to this standard must have been published by then and submitted for verification by the end of July 2022. The previous core environmental impacts that were assessed were as follows (EN 15804+A1)
- Global warming potential (GWP)
- Ozone depletion potential (ODP)
- Photochemical ozone creation potential (POCP)
- Acidification potential (AP)
- Eutrophication potential (EP)
- Abiotic depletion potential for minerals and metals (ADP for MM)
- Abiotic depletion potential for fossil resources (ADP for FR)
[edit] Related articles of Designing Buildings
- An in-depth look at Environmental Product Declarations EPDs.
- British Standards
- Collaboration, standards and their acronyms explained.
- European Standards
- Environmental product declaration EPD
- EN 15804+A2
- International Standards
- Mandatory environmental impact categories
- Optional environmental impact categories
- Product Environmental Footprint PEF
- Product category rules PCR.
- Sustainable procurement.
- The sustainability of construction works.
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Version 6 is now available, along with guidance for ECA members.
Post-War Homes: mid-century British architecture. Book review.
CIAT reflects on the party conferences.
CIOB announce the winners of the Art of Building photography competition.
National Scheme of Delegation introduced.
The cost of employing people remains a concern.
Code of Practice for Electrical Energy Storage Systems.
ECA calls on members to comment on draft 4th edition.
Bringing together expertise and creating cultural benefits.
CIOB celebrates positive Ofsted report.
The Building Safety Regulator announces a call for evidence.
Government approach could undermine delivery and regeneration.
World's first mass timber data centre.
The overlooked environmental aspect of data centre development.